Prepare a handover list from the anonymised shift notes below. End of shift: [date and time]. Notes: [paste notes]. First list, in time order, the tasks where a guest was promised a follow-up by a specific time. Then show open requests, and closed tasks last. Each line should include the room or case code, the last verified status, the next action and the responsible department if any. Do not treat “engineering was notified” as “fault fixed”. Merge updates on the same task into a single line. Keep the output short enough to read on the shift phone.
